exergy
Send an enquiry →
Case studies

Projects that meet customers’ environmental requirements

Here are some of our projects in different sectors. A chemicals producer got a carbon footprint calculator. A packaging firm reports to CDP. A service company sent its full target to SBTi.

71
EPDs
in 2025
9/10
CDP clients
with a B score
23%
of approved SBTi
submissions from Poland
88%
projects finished
before the deadline
Chemicals

Scope 1–3 carbon footprint calculator for a chemicals producer

D&R Dispersions & Resins adds Scope 3 to its footprint with a tool its team understands and controls.

CalculatorScope 3
Refrigeration

From a tender requirement to an EcoVadis bronze medal

NARS Polska started from a blank page. Its first score now helps in talks with large customers.

EcoVadis: bronzeFirst assessmentESG policies
Packaging

A full climate programme and a CDP B score

A packaging maker went from its own emissions to a CDP report. On the way it got a climate risk study (TCFD) and an SBTi plan.

CDP BSBTiScope 3TCFD
Overview
70+Published EPDs

Environmental Product Declarations we have prepared

An overview of public EPDs we prepared for ANWIL, GOLDBECK, Cognor and other companies.

See all declarations →
Heavy industry

Full Scope 3 for a large corporate group

We checked all 15 Scope 3 categories and chose the ones that matter. The group got a calculator for each year. An auditor checked the report.

Scope 3CalculatorESRS
Industrial production

Scope 3 footprint where downstream emissions dominate

About 75% of the footprint can come after the product is sold. That is outside the company’s own sites.

Scope 3Downstream
Services · SME

Scope 3 in a company with no production

The largest emissions came from purchases and staff commuting, not from the company’s own operations.

Scope 3CommutingPurchases
Metals

Product carbon footprint

An industrial product footprint based on physical allocation and production data, ready for B2B talks.

LCAProduct
Construction

LCA report and EPDs

Several groups of building products went through one LCA and one check. The declarations were ready to publish.

EPDLCAEN 15804
Component manufacturing

From Scopes 1 and 2 to a full Scope 3 method

A step-by-step path: from Scopes 1 and 2, through a Scope 3 method, to a calculator the team can use on its own.

Scopes 1 and 2Scope 3Calculator
Laboratories

Energy audit of a new laboratory building

87% of the yearly savings potential needs no investment. It comes only from setting the contracted power capacity at a realistic level.

Energy auditContracted capacityPayback < 5 years
Companies that trust us include
Ferrostal Anwil Goldbeck Sokołów JBB Bałdyga Grupa Maspex XPO

Have you received similar environmental requirements?

Tell us about your case. We will tell you what work makes sense, what data you need and where to start.