Your company builds, owns or manages buildings, and it is preparing SBTi targets. A standard target for Scopes 1, 2 and 3 may not be enough. The SBTi asks some real estate companies for a separate buildings target, per square metre, that also covers the energy their tenants use. Whether this applies to you depends on your role and on two 20% thresholds.

When must a company apply the SBTi Buildings Criteria?

When the SBTi Buildings Criteria applyA sector pathway is one part of an SBTi target, next to the targets for Scopes 1, 2 and 3. Some sector pathways are mandatory and some are optional. Buildings are mandatory, as are power, cement, steel and forest, land and agriculture, among others.

If your company qualifies for the buildings pathway, you must apply its criteria when you set your target. Three things decide whether you qualify, in this order:

  1. the group you belong to;
  2. your role in relation to buildings;
  3. the share of building emissions in your carbon footprint.

Who are you in the eyes of the SBTi?

The check starts before buildings even appear. First, the SBTi asks which group your company belongs to:

Your role in relation to the building matters, not your sector

Working in construction does not mean you must apply the Buildings Criteria. The SBTi looks above all at the role your company plays in relation to the building:

So this pathway may not cover a contractor or a materials maker. But it may cover a property fund or an owner who rents out buildings. But the role is only the first condition.

The 20% threshold: operational or embodied emissions

The second condition is the weight of building emissions in your carbon footprint. The SBTi uses two separate 20% thresholds. Both are measured against your total emissions in Scopes 1, 2 and 3 (categories 1–14):

You do not have to exceed both thresholds. Depending on your business, one of them applies, or both.

Several roles at once

A company can play several roles at once. For example, it builds as a developer, keeps some buildings and rents them to tenants. In that case, it cannot choose the one most convenient category. It must include all its roles and all the emissions linked to them.

Operational and embodied emissions: two separate targets

Operational and embodied emissions of buildingsThe buildings criteria split emissions into two groups that arise at very different points in a building's life. Operational emissions arise every year while the building is in use. They come from heating, cooling, lighting, equipment and refrigerant leaks. Embodied emissions arise once, before the building opens. They come from making and moving materials, and from the building work.

A company that must meet both requirements cannot merge them into one target. It sets one target for each group.

If you do not have this data for your developments yet, the starting point is a carbon footprint calculation for each building.

Free download
8 common mistakes in SBTi target submissions

How to read the criteria, examples from real submissions and a validation checklist, based on the submissions we have worked on.

Download for free →

How is a buildings target calculated?

Calculating an SBTi buildings targetFour rules decide what data you need to show building emissions reliably. They are what most often surprises companies the first time.

The whole building, including tenants

The target for operational emissions covers all energy used in the building. This includes spaces the owner or manager controls and spaces rented by tenants, whatever consolidation approach you use. The SBTi wants to see the real emissions of the whole building, not only the part on the owner's own invoices.

So it is not enough to show power for shared areas, corridor lights, lifts or energy you buy for the whole site. You must also include energy use in tenants' spaces, even when tenants have their own energy contracts. This leads to a very practical first question: do you have data on your tenants' energy use?

Refrigerants inside the target boundary

The whole-building approach does not end with energy. The criteria also require leaks, above all refrigerant leaks from air conditioning, heat pumps and cooling systems. They must be in both the inventory and the target boundary, also when the equipment runs in tenants' spaces.

A target in kg CO₂e per square metre

The target for operational emissions is set per unit of area: kilograms of CO₂e per square metre. The area is the total floor area of the building, with tenants' spaces and common areas. You must use the same definition of area in the base year and in the target year.

Separately for building types and locations

A company with different types of buildings, or buildings in several countries, does not calculate one average. In the SBTi tool, you first group buildings by type and location. For example, offices in Germany form one group, warehouses in Germany another and offices in the UK a third.

Each group has its own reduction pathway. Only at the end are the results combined into one target for all your buildings. This way, a high-emission group of buildings does not disappear in an average with buildings that already have low emissions.

What should you prepare for the submission?

Documents for an SBTi buildings target submissionThe buildings criteria go beyond counting emissions. You fill in the SBTi Buildings Target-Setting Tool. You also make a commitment that will shape your investment plans for years.

No new fossil fuel equipment from 2030

You must publicly commit that from 2030 at the latest, you will not install new fossil fuel equipment in buildings you own or control financially. This covers heating, hot water, cooking and power made on site, in new and old buildings.

This is not a duty to replace all boilers in 2030. An existing installation can run until the end of its life. But when it wears out, you should not replace it with another fossil fuel system. Exceptions include backup systems and cases where the law requires it.

The SBTi also suggests that you publicly commit to make these buildings use less energy. But this is only advice. Validation does not check it.

Checklist before validation

Before your submission goes to validation, four questions should be closed:

01
Do the criteria apply to your company?

Your role in the building and the 20% threshold for either group of emissions.

02
Which emissions does the target cover?

Operational, embodied or both groups; in the last case, two separate targets.

03
How is the target calculated?

The whole building with tenants and refrigerants, in kg CO₂e per m², split by building type and location.

04
What do you need to submit?

The SBTi tool with your figures, the public 2030 commitment and proof of your data and assumptions, if needed.

When these are ready, you can move on to validation itself. We describe how it works, how long it takes and what happens after approval in our guide to science based targets.

Do you need support with your SBTi target submission?

Almost one in four Polish SBTi submissions went through our hands: we handled 23% of approved submissions from Poland up to the end of 2024. We were among the first to guide companies through this process. We cover the emissions inventory, the choice of pathway, the target, validation and yearly progress reports.

See how we handle SBTi target submission and validation.

Contact us
Do you want to check whether your buildings fall under the SBTi criteria?
+48 888 242 547 contact@exergy.eco

We use your details only to reply to your enquiry. More in our privacy policy.

See also
Service
SBTi target validation – submission support
Article
SBTi Net-Zero Standard V2.0: what changes for companies?
Download
8 common mistakes in SBTi target submissions (guide)